Derby Trail Forums

Go Back   Derby Trail Forums > Main Forum > International Racing
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 10-05-2007, 02:32 PM
saratogabrit saratogabrit is offline
Cahokia Downs
 
Join Date: Jul 2007
Posts: 166
Default How Long Will it Take to Rebuild Longchamp

I believe that work will start after the last days racing at the end of the month for a major rebuild to Longchamp.

I have no idea how long the works will take but I can't see it being ready for April so I guess all the Spring G1s will be relocated to Saint Cloud, Chantilly.

Hopefully the new Longchamp will be ready in time for the Prix Moulin the 1st Group 1 of the Autumn in early September 2008. If the track isn't ready by Arc weekend-i guess they will either do a Churchill and run on a building site or shock horror move the race to England-as there's no track in France that can cope with the numbers.

I think i have faith in them not to destroy Longchamp's charm and character. They did a very sensitive job modernising Chantilly last year not like the unforgiveable rebuild of Ascot.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 03:53 PM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.